L&T Bags over Rs 2,000 Crore power plant order from GMR

25 Sep 2009 Evaluate

Larsen & Toubro (L&T) has received an order valued over Rs. 2000 crore from GMR Energy Limited, for setting up a 2 x 384 MW gas based power plant at Vemagiri, near Rajamundry, Andhra Pradesh on a lumpsum turnkey basis. L&T's scope includes design, detailed engineering, supply, installation and commissioning of the plant on a turnkey basis.

 

L&T-Sargent and Lundy, a subsidiary of L&T, will carry out the plant integration and detailed engineering, using propriety technology of Sargent & Lundy LLC, USA. L&T will design and manufacture critical equipment for the plant, like heat recovery steam generators, deareators, condensers, cooling towers, switchgear, valves.

 

The plant will incorporate advanced class gas turbines and high efficiency steam turbines which will be procured by L&T. Construction, installation, commissioning and project management will also be carried out by L&T. The project will be executed on fast track and completed in the 11th plan. L&T had set up a similar plant of 388.5 MW for the GMR Group at the same location which was commissioned in 2006.

crackcrack

Larsen & Toubro Share Price

3482.50 -23.10 (-0.66%)
21-Nov-2024 16:59 View Price Chart
Peers
Company Name CMP
Larsen & Toubro 3482.50
Rail Vikas Nigam 421.65
NCC 272.20
KEC International 992.10
Kalpataru Projects 1143.85
View more..
© 2024 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt. Ltd.