Hindustan Construction is currently trading at Rs. 22.85, up by 1.95 points or 9.33% from its previous closing of Rs. 20.90 on the BSE.
The scrip opened at Rs. 20.90 and has touched a high and low of Rs. 23.40 and Rs. 20.90 respectively. So far 4410273 shares were traded on the counter.
The BSE group 'A' stock of face value Rs. 1 has touched a 52 week high of Rs. 29.20 on 21-Oct-2015 and a 52 week low of Rs. 16.35 on 25-Aug-2015.
Last one week high and low of the scrip stood at Rs. 21.60 and Rs. 19.40 respectively. The current market cap of the company is Rs. 1776.48 crore.
The promoters holding in the company stood at 36.07%, while Institutions and Non-Institutions held 23.90% and 40.03% respectively.
Hindustan Construction Company (HCC), acting as a lead partner in the joint venture with MMS of Russia, has been awarded Rs 2523 crore contract by the Mumbai Metro Rail Corporation (MMRCL).
The contract is for construction of 4,072 meter corridor of the underground metro line including four underground stations at Chhatrapati Shivaji Terminus, Kalbadevi, Girgaon and Grant Road and twin bored tunnels of total length of 3115 m. The project is to be completed in 55 months.
This is part of the Line 3 of the Mumbai Metro from Colaba to SEEPZ. When completed, the 33.5 km long line with 26 underground and one at-grade station will be the first underground metro line in Mumbai.
HCC is a leader in engineering and construction space. The company has established a vast presence and gained recognition in the sectors of Hydro Power, Water Solutions, Transportation and Nuclear Power.
Company Name | CMP |
---|---|
Larsen & Toubro | 3501.15 |
Rail Vikas Nigam | 371.90 |
NCC | 242.65 |
KEC International | 952.65 |
Kalpataru Projects | 1176.80 |
View more.. |