Vindhya Telelinks gets nod for expansion-cum-diversification of Copper Cable facility at Rewa

16 May 2017 Evaluate

Vindhya Telelinks has received an approval for substantial expansion-cum-diversification of the company’s existing Copper Cable facility at Rewa, to be executed in stages, for manufacturing of Electron Beam Irradiated Cross-linked Cables including installation of Electron Beam Accelerator(s) of appropriate rated capacity, with an estimated capital outlay of Rs 32.75 crore, to be funded by a mix of internal accruals and debt. The board of directors at its meeting held on May 15, 2017 has approved for the same. The substantial expansion-cum-diversification project is likely to be operational in two stages by December, 2017.

The company is presently engaged in the manufacturing of a wide variety of Cables and it has been decided to expand its products portfolio by diversification into the high end market of specialized electrical cables and electron beam irradiated cross-linked cables. The market for such cables is rapidly expanding due to the exacting technical requirements of new applications and the gradual transition from the conventional cables to the new genre of Electron Beam Irradiated Cables particularly in the market segment of Solar Energy (DC Solar Cables), Railways, Ship Building, etc.

Vindhya Telelinks is engaged in the manufacture of cables and engineering, procurement and construction (EPC). The company is engaged in the business of manufacturing and sale of telecommunication cables, other types of wires and cables, fiber reinforced plastic (FRP) rods/glass rovings and connectorized cable products.

Vindhya Telelinks Share Price

1907.55 -27.70 (-1.43%)
23-Dec-2024 13:31 View Price Chart
Peers
Company Name CMP
Vindhya Telelinks 1907.55
HFCL 112.20
GTL Infrastructure 2.05
Bondada Engineering 620.00
Suyog Telematics 1876.00
View more..
© 2024 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt. Ltd.