Hindustan Construction Company (HCC) has secured its third contract worth Rs 373 crore from the Delhi Metro Rail Corporation (DMRC). The latest contract is for design and construction of 2.2km twin tunnel between Shalimar Baug and Netaji Subhash Place stations of the Mukundour -Yamuna Vihar corridor, under Phase III of the Delhi Metro.
The contract has to be executed within a period of 36 months and the scope of the work includes, twin tunnel between Shalimar Baug and Netaji Subhash Place Station by Shield TBM, twin box tunnel (cut & cover tunnel), underground ramp and architectural finishing of Shalimar Baug (underground station and ) Netaji Subhash Place (Semi-underground).
HCC is a leader in engineering and construction space. The company has established a vast presence and gained recognition in the sectors of Hydro Power, Water Solutions, Transportation and Nuclear Power.
Company Name | CMP |
---|---|
Larsen & Toubro | 3499.15 |
Rail Vikas Nigam | 372.25 |
NCC | 241.25 |
KEC International | 953.55 |
Kalpataru Projects | 1176.75 |
View more.. |