NLC India through its Joint Venture (JV) Company Neyveli Uttar Pradesh Power (NUPPL) is setting up 1980 MW (3 x 660 MW) Coal based Thermal Power Project at Ghatampur, Kanpur Dist., Uttar Pradesh (UP). With allocation order issued by Ministry of Power (dated February 15, 2023), entire Power of 1980 MW has been now tied up with Uttar Pradesh (1487.28 MW) and Assam (492.72 MW). The erection and commissioning activities of the project are in advanced stage.
The company has also planned to setup another Coal based Pit Head Thermal Power Project of 2400 MW (3 x 800 MW) at Talabira, Jharsuguda Dist., Odisha. For this project also, entire power has been tied up with Ministry of Power’s Power Allocation Order dated February 15, 2023 (Tamil Nadu 1500 MW, Union Territory of Pondicherry 100 MW, Kerala 400 MW and Odisha 400 MW). A Single package EPC Tender for this project has already been floated and techno commercial evaluation of bids are in advanced stage of completion.
NLC India is engaged in the business of lignite mining and power generation.
Company Name | CMP |
---|---|
NTPC | 321.25 |
Tata Power | 365.50 |
Power Grid Corp | 298.65 |
Adani Power | 549.30 |
Torrent Power | 1422.90 |
View more.. |