Tata Power is all-set to manage the increasing demand for power in the summer season and has taken extensive measures across its Generation, Transmission and Distribution verticals to ensure uninterrupted power supply to Mumbai. Having deployed cutting-edge artificial intelligence and machine learning tools to monitor and forecast demand, the company expects the demand for April-June-2024 to be peak at 1,030 MW from its consumer base in Mumbai.
Tata Power Mumbai Distribution has informed all its contracted generating units to keep full availability during this period. On-ground transmission & distribution service team has been given detailed work instructions, checklists, video tutorial training and schematics to ensure that they are fully equipped with the knowledge and tools necessary for maintaining the efficiency and reliability of the power network.
The company has enhanced the distribution service by quick restoration of power through adoption of cutting-edge Auto Transfer Schemes (ATS), LoRa IoT solutions, and Feeder Remote Terminal Units (FRTU) in its Distribution Substations (DSS) and Customer Service Stations (CSS). It is also monitoring the network through thermal scanning of transformers, feeder pillars, and cables. Additionally, the analysis of CCTV footage, along with housekeeping and intruder alerts, is ensuring a secure and safe workplace.
Tata Power Company is India’s largest integrated power company.
Company Name | CMP |
---|---|
NTPC | 333.30 |
Tata Power | 401.25 |
Power Grid Corp | 315.75 |
Adani Power | 498.45 |
Torrent Power | 1476.80 |
View more.. |