GPT Infraprojects has received the contract totalling to Rs 204 crore from CAO Construction, South Eastern Railway, Kolkata. The contract is for Construction of Road Over Bridge (3 lane) with bridge proper (1x30m Composite Girder +1x60m Bow String Girder + 1x30m Composite Girder) and Bridge Approaches (17x24.6mPSC Girder + 3x20.6m PSC Girder) at Km: 15/22-24 in lieu of LC No. 13 between Andul-Sankrail Station and construction of Road Over Bridge (2 lane) with Bridge proper (1x18m Composite Girder + 1x60m Bow String Girder + 1x36m Composite Girder) and Bridge Approaches (18x25.36m PSC Girder + 2x10.0m RCC slab) at Km: 23/17-19 In Lieu of L.C No. 18 between Nalpur-Bauria Stations of Howrah-Kharagpur section under the jurisdiction of Dy CE/Con/Garden Reach, S. E. Railway.
GPT Infraprojects, the flagship company of the GPT Group is a premier Infrastructure company based out of Kolkata, India.
Company Name | CMP |
---|---|
Larsen & Toubro | 3574.75 |
Rail Vikas Nigam | 448.00 |
NCC | 308.00 |
KEC International | 973.00 |
Kalpataru Projects | 1261.60 |
View more.. |