GE T&D India has achieved a new milestone in its Champa-Kurukshetra ultra-high-voltage direct current (UHVDC) project by successfully energizing the third of four poles planned for the project. This adds an additional 1,500 MW of capacity to the 1,287-km link, which is now transmitting 4,500 MW.
A special feature of the Champa project is the use of an overhead line with dedicated metallic return, which uses a neutral conductor as a part of the DC circuit. GE is the first company in the world to demonstrate this technology with this project and is therefore providing additional value to the customer by eliminating the typical technical and environmental issues associated with the traditional electrode solution.
GE T&D India is engaged in power transmission and distribution. Its products and systems serve to transmit and distribute electricity, ensure the reliability, quality and safety of energy flows, as well as operate efficient networks through information management.
Company Name | CMP |
---|---|
Havells India | 1665.50 |
Siemens | 6854.15 |
Apar Inds | 9280.25 |
Waaree Energies | 2707.05 |
ABB India | 6905.05 |
View more.. |