Dilip Buildcon has emerged as L-1 bidder for two new HAM projects Bengaluru -Vijsyawada under Bharatmala Pariyojana Phase-I (Package - 1 and Package - 4) ) in the state of Andhra Pradesh. The bid for the lenders floated by the National Highways Authority of India on Hybrid Annuity basis. The total project cost is Rs 1373.60 crore.
The first project is for Development of Six-Lane Access Controlled Greenfield Highway from Kodur (Ch. 0.000) to vanavolu (Ch. 24.100) [NH-544G] Bengaluru Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the State of Andhra Pradesh (Package-1).
The second project is for Development of Six-Lane Access Controlled Greenfield Highway from Odulapalle (Ch.72+000) to Nallacheruvupalli (Ch. 96+300) of [NH-544G] Bengaluru Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the State of Andhra Pradesh (Package-4).
Dilip Buildcon’s core business is undertaking construction projects across India in the roads and irrigation sectors. They specialize in constructing state and national highways, city roads, culverts and bridges.
Company Name | CMP |
---|---|
Dilip Buildcon | 454.55 |
Macrotech Developers | 1370.55 |
NBCC (India) | 92.99 |
Phoenix Mills | 1589.95 |
Ahluwalia Contract(I | 1042.20 |
View more.. |